Stock code:SZ 002334
Current location:Home Solutions Solar Power Generation
Solar Power Generation
Changsha, Hunan 1.2MWp distributed solar project
Click amount:
The project adopts 3546 pieces 320 polysilicon solar modules, 272 pieces 260 polysilicon solar modules, 34 sets of INVT BG33KTR inverter, two sets of INVT BG30KTR inverter, one set of INVT BG10KTR inverter. The project adopts the best angle model of stent, the total installed capacity is 1204KWp, two parallel points, 380v low voltage  grid-connection. The annual power generation is expected to reach 1096,700 degrees.
Project adopts the cooperation mode of contract energy management, building owners provide roof for free, solar power generation is sold to the building owners by the current price of 8.5 discount. 


Energy Efficiency Table of 1.2MWp Distributed Solar Project Investment in Changsha, Hunan Province 

NO.

Program

value

1

Total Project Investment

8.9124million

2

IRR ( total investment ) rate of return

12.59%

3

First year power generation

1.1769million

4

Static investment payback period (after tax)

6.09years

5

Total investment rate of return

7.03%

6

Comprehensive price (tax included) 1 - 5 years

1.3436 yuan/KWh

Comprehensive price (tax included) 6-20 years

1.2456 yuan/KWh

Comprehensive price (tax included) 21-25 years

1.0436 yuan/KWh

7

annual savings of  standard coal

394.79 tons

8

annual reduced SO2 emissions

32.90 tons

9

annual reduced CO2 emissions

1093.36 tons

The project is difficult to build a total of 11 solar buildings, the project is scattered and need to be confluence to achieve grid-connection.
The project achieves grid-connection in June 2017 and is in normal operation at present.